Concrete Block Curing Chamber Racking System
 
 

This Racking System comes with a product guarantee. The hot deep galvanization is done after the fabrication of the Curing Racks. This process covers all the sharp edges to protect the system from rusting.

It allows using the place to the maximum. Last in First Out (LIFO) process is used. The best of all is the installation and equipment costs are low.

Easy to install and cost effective.

This has been used with many well known Block and Interlocking making machines. E.g: Masa, Hess, Zenith and Rekers.

Our precuts are statically guaranteed for 5 years for the working conditions supported in EN ISO 1461. Rack system is hot – dip galvanized after fabrication.(EN ISO 1461)

Our unique K Section for column can bear more load

   

     


 
 
 
 
Home Profile Products Feedback Branches Enquiry Contact us